User guide · Part one

The NuraNet mobile app, screen by screen

12 sections, each with a picture of that screen and an explanation of what each number is, when it is worrying, and where to go next.

The marks beside each section title: Beginner means you need it to get started, Everyday user means the operator's daily work, Advanced means you can skip it for now and come back later. If you are new, read only the green sections; you can monitor your plant today.

1Installation and set-upBeginner

The NuraNet app is built for Android 5 and later and is an APK file. There is no install file for the iPhone, but the web version opens the same screens in the browser.

  1. Get the fileOn the download page, tap "Download NuraNet". The file is small and installing it does not need fast internet.
  2. Allow installationFor a file that did not come from Google Play, Android asks once: "Allow installs from this source?" — confirm. It asks only once.
  3. Allow notificationsOn first run, Android 13 and later asks permission to show notifications. If you refuse, the app works but error and inverter-outage alerts will not reach you.
  4. Turn off battery optimisation for NuraNetThis is the most important step, and the one most often forgotten. To save power, Android puts background apps to sleep; in the phone's settings, under Battery, set NuraNet to "Unrestricted" so background monitoring really works.

On an iPhone or any browser: open nuraanet.ir/app/ and tap "Add to Home Screen". The icon sits on the screen like an installed app. The only difference is that background notifications and fingerprint login are Android-only.

2First loginBeginner

The login screen offers you three ways in. If you are new, start with the bottom button.

NuraNet app login screen with server address, username, password, fingerprint login and guest login
The NuraNet app login screen
  1. Server address — already set to https://nuraanet.ir. Don't touch it unless your plant has its own server and we have given you another address.
  2. Fingerprint login — becomes available after the first successful login. From then on you no longer need to type the password every time.
  3. Username and password — the ones we gave you when the plant was handed over. If you have lost your password, the administrator can reset it from the admin panel.
  4. Guest login — you enter without any account and the app runs on sample data. It is the best place to learn: no number is real, so you cannot break anything.

One account, one device

Each user account is tied to one phone. If you sign in on another phone, that phone stays "awaiting approval" until the administrator approves it, and the previous phone keeps working in the meantime. So changing phones does not cut you off from your plant. The restriction is deliberate: a leaked username cannot be used to look into the plant from ten phones.

If you get the message "this account must sign in from another program": the app account, the web-version account and the station-portal account are separate. The message says exactly which program; it is not your mistake.

3The plants screenBeginner

The first screen after login. Even if you have only one plant this screen appears — and it is the one screen you should look at every morning.

The plants list in the NuraNet app with the status summary card and colour grouping
The plants list — the summary at the top and the grouped cards
  1. Summary card — "All plants: 4" and then six counters: no data, disconnected from the server, error/alarm, inverter outage, AI diagnosis, and normal. A counter at zero stays faded, so your eye goes only to what is actually there.
  2. Groups — plants are grouped by status and the worst group comes to the top. If a plant has an error, you don't have to look for it; it comes to the top by itself.
  3. Each plant's card — name, city, status label and three figures: instantaneous power (kW), today's energy (kWh) and the number of inverters online out of the total.
  4. Coloured bar beside the card — the same seven standard colours. Green means healthy; grey means no data has arrived yet.
  5. The gear at the top — settings: language, calendar, theme, background monitoring and user account.

To refresh, pull the screen down with your finger. To open a plant, tap its card.

"No data" is not the same as "disconnected". "No data" means the plant is registered but has never sent anything yet — usually a plant not yet installed and commissioned. "Disconnected" means it used to send and now doesn't; that one really is a problem.

4A plant's screen — the topBeginner

When you tap a plant, a long screen opens that scrolls down with your finger. It has three parts; this part is the top.

The plant screen in the NuraNet app: status bar, details card, six indicator cards and the inverter diagram
The top of the plant screen — status, details and six indicators
  1. Status bar — "Normal · Inverters 7/7". That one line answers the question "is there a problem today?". If the data is stale, a separate warning bar is added here too.
  2. Details card — the plant's name and city, the current weather ("Clear sky | 37.7 C"), the time of the last update and the geographic coordinates.
  3. Power — kW at this moment.
  4. Today — kWh produced from midnight until now. It is the measured figure, not an estimate.
  5. Efficiency — the plant's performance as a percentage of what was expected.
  6. Expected today — the AI's forecast for the whole of today. This figure is an estimate; it is not the same as the "Today" card, and it shouldn't be.
  7. Mode and Inverters — the plant's operating status and the number of responding inverters out of the total.
  8. Inverter details — each inverter is a box with a panel above it. The coloured dot beside the number is that inverter's status. Tapping a box opens that inverter's detail screen.

Don't confuse "Today" with "Expected today". The first is what has actually been produced up to this hour; the second is what the AI forecasts for the whole day. At 10 a.m. it is normal for the first to be much lower than the second. Save the comparison for sunset.

5Charts and choosing a periodEveryday user

A little further down you see two charts. Above both is a shared period selector; change the period and both charts change together.

Daily production chart and plant output power chart in the NuraNet app
Daily production (bars) and plant output power (line)
  1. Daily production — one bar per day, in kWh. To see how today did compared with yesterday and the day before. Dates are written in the calendar you chose in the settings.
  2. Plant output power — the kW curve over time. Its normal shape is an arch: it rises from sunrise, peaks at noon and drops to zero at sunset.
  3. The warning under the chart — "The chart is broken in 1 period — no data was received in that period". Take this line seriously: a gap in the chart is not "zero production", it is "we don't know". NuraNet keeps the two apart on purpose.

How to read a curve

  • A smooth arch with no teeth = a clear, sunny day.
  • Sharp teeth during the day = passing clouds. Not a fault.
  • A step drop that doesn't come back = an inverter has dropped out. Go to "Inverter details".
  • An arch that is always shorter than on previous days = a gradual decline; dust on the panels or a lost string.
  • Zero after sunset = normal, and NuraNet does not count it as an error.

6Reports, alerts and the health cardEveryday user

At the end of the plant screen there are two cards: one is the door to the reports, the other a summary of health and value.

The reports card and the health and value card in the NuraNet app
The reports card and the "Health and value" card
  1. Energy meter — production per inverter, over periods of 7 to 365 days. The next section.
  2. Analysis — a chart of any parameter you want (MPPT current, voltage, temperature …) for selected inverters.
  3. All errors and alarms — the complete list of events. Under this button two figures are written: the number of critical items and the number of AI diagnoses, in two different colours.
  4. Health and value — today's peak (kW), AI health (percentage + risk level), the plant's lifetime energy (kWh), CO₂ avoided (kg) and the number of critical jobs.

Why errors and AI findings are in two groups

"Error" means the inverter itself gave an error code — something that cannot be denied. "AI diagnosis" means no code was recorded but the behaviour is abnormal; for example a string carrying half the current of its neighbours. If we poured the two into one list, real errors would get lost under a heap of findings. Deal with the reds first, then the blues.

7Energy meterEveryday user

The most used report. It answers "how much did we produce this month" and, more importantly, "which inverter's share is lower than the others".

The NuraNet app energy meter with a colour bar chart per inverter
Energy meter — period, view mode, four indicators, chart and table
  1. Period — last 7 days, last 30 days, 90 days, last year.
  2. Per inverter / Total — "Total" gives one bar per day; "Per inverter" splits each day's bar into each inverter's colour. To compare inverters, always choose "Per inverter".
  3. Four indicators — total energy for the period, daily average, best day (with its date) and active days (for example 7/7 means we had data on all seven days).
  4. Bar chart — each colour is one inverter. The colour legend is below the chart. You can zoom with two fingers.
  5. Energy table per inverter — at the bottom of the screen, columns for today, 7 days, 30 days and one year for each inverter. The table scrolls sideways.

A practical trick: in "Per inverter" mode, instead of reading numbers, look at the shape of the bars. If all colours are roughly the same height, the plant is balanced. The colour that is shorter than the others every day is the inverter you need to go to — and you don't have to calculate anything.

8Data analysisAdvanced

This screen is for when you have a more precise question: "what happened to the string voltage of that inverter yesterday at noon?" Here you can plot any parameter over any period for any set of inverters.

The NuraNet app data analysis screen with parameter, period and inverter selection
Data analysis — parameter, period, aggregation and inverter selection
  1. Parameter — a drop-down list: the current of every MPPT, voltage, power, temperature and the other quantities the inverter reports.
  2. Period — last 24 hours, 7 days, 30 days, or "custom range" with a calendar.
  3. Display mode — "All, each separately" draws one line per input (to find the odd one out); "Sum of all" and "Average of all" combine everything into one line (to see the overall trend).
  4. Choosing inverters — with 35 inverters, plotting all of them together is unreadable. Pick two or three and compare.
  5. Colour legend — under the chart, with an "inverter/MPPT" code such as 2/3, meaning MPPT number 3 of inverter number 2.

Its most effective use

Choose the parameter "current of all MPPTs" with the display "All, each separately" and a 24-hour period. In a healthy plant, all the lines form one tight bundle. Any line that breaks away from the bundle and runs lower is a problem string — shade, soiling, a loose connection or a burnt diode. This single look does the work you would otherwise have to do with a multimeter out in the field.

9An inverter's detailsAdvanced

In the plant screen's "Inverter details", tapping any inverter opens this screen. It is the deepest the app goes.

The inverter detail screen in the NuraNet app with the DC input table per MPPT and per string
Inverter details — the DC input of each MPPT and each string
  1. Header — inverter number, online/offline label and three figures: active power (kW), today's energy (kWh) and operating mode.
  2. DC input — per MPPT — for each input: voltage (V), current (A), power (W) and share of DC as a percentage. The share column is the most important column in this table.
  3. DC input — per string — finer still: each string with its MPPT number and its own number, its current, and its deviation from the average. Large negative deviations are written in red.

How to read the "deviation from the average" column

All strings of one inverter work under one sky and at one angle, so they should give roughly equal current. NuraNet calculates the average and writes each string's distance from it:

  • Under ±10% — normal. Manufacturing differences between panels and a little dust.
  • 10 to 30% negative — partial shade, local soiling or a loose connection. Worth a visit.
  • More than 50% negative — the string is practically lost: fuse, connector or bypass diode. Deal with it the same day.

In the picture above, the even strings are about 58 to 68 percent below the average and the odd strings above it — a regular pattern that usually means the problem is not one panel but the wiring or the alternating arrangement of the strings.

Why this screen only reads and changes nothing: the app deliberately sends no command to the inverter. Configuration changes are made only from the plant's own Windows software, with authorised access. A lost phone must not be able to shut down a plant.

10Settings, notifications and accountBeginner

From the gear at the top of the plants list. It has five tabs.

NuraNet app settings — the Appearance tab with theme selection and the background monitoring switch
Settings → "Appearance" tab: theme and background monitoring
  1. Profile — your first name, surname and contact details. This is the information the administrator sees in the admin panel.
  2. Appearance — light, dark or "system default" theme; and the background monitoring switch.
  3. Language — Persian or English. The whole app changes, including the screen direction.
  4. Calendar — Persian solar, Gregorian or Hijri. The "calendar follows the language" option is on, so Persian gives the solar calendar automatically; turn it off to choose yourself. Under each option today's date is written in that calendar, so your choice isn't abstract.
  5. Account — the current user's card and the sign-out button.

Background monitoring — the most important switch on this screen

When it is on, the app checks the plants every few minutes even when it is closed, and notifies you if an error, an inverter outage or a loss of connection occurs. It is the only way to be told without opening the app. If you get no notifications, check these three in order:

  1. Is this switch on?Settings → Appearance → Background monitoring.
  2. Have you allowed notifications?In the phone's settings: Apps, NuraNet, Notifications.
  3. Has the battery put the app to sleep?In the phone's settings, under Battery, set NuraNet to "Unrestricted". On Xiaomi, Huawei and Samsung phones this is the most common cause.

Signing out deletes the data on the phone. This is deliberate: a chart left in memory belongs to an account that has gone, and must not fall into the next person's hands. After signing in again, everything comes back from the server.

11Everyday tasks, step by stepEveryday user

Open any of them — we have written exactly what you need to do.

What should I check when I wake up in the morning? (30 seconds)
  1. Open the app and look at the summary card at the top of the list.
  2. If all counters except "Normal" are zero, you are done.
  3. If not, go to the group that has come to the top and open that plant's card.
  4. Read the status bar at the top of the plant screen and the "Inverters 7/7" counter.
Production is low today. Where do I start?
  1. On the plant screen, check the weather — if it is cloudy, probably nothing is broken.
  2. Look at the "Plant output power" chart: a step drop means an inverter has gone; a short smooth arch means low irradiance.
  3. Look at the inverter counter. If it is, say, 6/7, find the stopped inverter in "Inverter details" by its coloured dot.
  4. If all are online, open the energy meter in "Per inverter" mode and see which colour is shorter.
  5. Open that inverter and read the "deviation from the average" column.
I want last month's production report
  1. Plant screen → reports card → Energy meter.
  2. Choose the "last 30 days" period.
  3. The "total energy for the period" figure is your answer; "daily average" and "best day" are right there too.
  4. To split by inverter, use "Per inverter" mode and the table at the bottom of the screen.

The financial and revenue report is more complete in the Windows software — here.

I got a notification. What now?
  1. Tap the notification to open the app on that plant.
  2. Open "All errors and alarms" and read the new event.
  3. If it is an error (red): note the error code and give it to the plant's technical manager.
  4. If it is an AI finding (blue): it is not urgent; but it is recorded in that inverter's details and should be checked within the same week.
  5. If it is a loss of connection (orange): the problem is the internet or the power of the plant computer, not the panels.
I want to give a colleague access too

Accounts are created by the administrator, not by the app itself. Contact us and we will create a username for your colleague and link it to the same plant. Their account is approved on their own phone and your account stays untouched. Don't share an account: with one account, only one phone can stay active.

12When something doesn't workBeginner

SymptomFirst suspectWhat to do
I can't sign in; it says the username or password is wrong The account belongs to the web version or the station portal The error message usually says which program to sign in with. If it doesn't, contact us so we can check the account.
It says the device is awaiting approval You have signed in with a new phone That is normal. Use the previous phone until the administrator approves. Approval usually happens the same day.
The numbers don't change The data is stale Check "Last update" on the details card. If it is hours old, the problem is at the plant, not on your phone.
I get no notifications Battery optimisation Do the three steps of the "Background monitoring" section in order.
The chart has gaps No data arrived in that period It is not an app error. A gap means "we don't know", and is shown deliberately instead of zero.
On opening, the app says I must update An old version Install the new file from the download page; it installs over the previous version and your account stays.
I don't see any plants Your account has not yet been linked to a plant Contact us; it is a one-minute job in the admin panel.
Read on

More about NuraNet

Want to see the app on your own plant?

We will create a demo account for you to practise these same screens on real data.

The same number answers on WhatsApp, Telegram, Eitaa and Bale.