"84 percent efficiency" is a meaningless number until you say on what basis. NuraNet calculates its indicators on the basis of recognised international standards and cites them in its reports.
When you tell an investor or employer "the plant's efficiency is 84 percent", the first right question is: 84 percent on what basis? If the answer is "on our own formula", the number is neither comparable nor defensible. If the answer is "IEC 61724", any expert in the world knows exactly what was measured.
NuraNet and TavanaNet calculate their indicators on the basis of these very standards and cite them in their reports.
| Standard | Subject | In our products |
|---|---|---|
| IEC 61724 | Photovoltaic plant performance | Calculation of performance ratio (PR), specific yield and availability — the basis of the performance-guarantee report to the employer and investor. |
| IEC 62446 | DC-side inspection and documentation | Assessment of string and DC array health; the basis for string analysis and for detecting an abnormal drop of one string relative to its group. |
| IEEE 519 | Harmonic control in power systems | Calculation and assessment of voltage THD and current TDD at the point of common coupling, to check the plant's or factory's compliance with the allowed limits. |
| IEC 61000-4-30 | Power-quality measurement methods | Classification and interval-aggregation methods for measuring power quality and recording events, so the reported figures are defensible and comparable. |
| EN 50160 | Voltage characteristics of public networks | Assessment of voltage, frequency, flicker and unbalance against the grid limits — and telling whether a problem is on the grid side or the consumer side. |
| ISA 18.2 | Alarm system management | The alarm life cycle: active, acknowledged, shelved, escalated and closed — instead of an endless list of warnings that nobody reads. |
| EEMUA-191 | Alarm system performance indicators | Measuring whether the alarm rate is manageable for one operator at all; a system that gives ten alarms a minute effectively gives none. |
| Grid codes (VDE / IEC / IEEE) | Behaviour under grid disturbances | Checking the allowed voltage and frequency ranges and the expected inverter behaviour, to tell whether an inverter trip was a correct response to the grid or a failure. |
| IATF 16949 | Quality in the automotive industry | Applies to our instrumentation systems (air gauge and LVDT): master-based calibration and measurement traceability. |
An exact PR calculation per IEC 61724 needs a measurement of solar irradiance on site. Many small and medium plants have no irradiance sensor (pyranometer).
In that case NuraNet uses local weather data as an estimate and does not hide it: the resulting figure is fully valid for following trends and comparing inverters with each other, but for a contractual performance-guarantee report a pyranometer is recommended. If a sensor is installed, NuraNet reads the real data and uses it as the basis.
Why we write this: a seller who says "we give an exact PR without a sensor too" either doesn't know what they are saying or hopes you don't. We would rather you know from the start which number holds up in a contract and which is for day-to-day management.
All with PDF output, fit to present to the employer, investor or distribution company.
We will send you a sample PR and power-quality report.
The same number answers on WhatsApp, Telegram, Eitaa and Bale.