The complete list

All the features of the NuraNet solar plant monitoring system

This page is the complete, unexaggerated list of what NuraNet does, ordered along the data path: from the moment a Modbus register is read to the moment someone makes a decision based on it.

1. Data collection

Everything above comes from this layer. If data is collected wrong, no analysis can save it.

🔌

Modbus RTU and TCP reading

Block reading of registers with function codes 3 and 4, automatic detection of the inverter type and a dedicated map for each model. Ready profiles for KStar (the whole KSG family and the G series), Sungrow, Growatt (MIN/TL3/MAX 1500V/MIX/SPA/SPH), INVT XG series and Solax X3, plus the ASCII protocol of KACO inverters. The status and error codes of every brand are translated into one common language, so every rule and every colour is the same for all.

The RS-485 bus is shared in a coordinated way between the inverter collector and the analyzer collector: two polls never go out on one port at the same time, and the input buffer is cleared before every write so that one device's late reply cannot corrupt the next read.

Modbus RTUModbus TCPFC03 / FC04Block reading
⏱️

Precise poll scheduling

The polling interval is counted from the end of the previous read, not its start; so a slow read never makes cycles overlap. An interval of zero is also allowed, for when you want the fastest possible rate.

The standard Modbus silent interval is respected between a device's register blocks and between two devices.

End-to-end intervalZero allowed3.5-character silence
📟

Power meters and power analyzers

Alongside the inverters, power meters and power analyzers are read on the same industrial bus. Each device has its own place in the plant: solar output, load, grid, diesel, main incomer, export meter or sub-meter. The Windows software reads up to 8 devices, and NuraNet Link reads up to 4 on the same RS-485 line.

Ready profiles for Schneider PM2220 and PM2230, Femto (four-period tariff, demand and current harmonics), Janitza UMG 96RM-E, Lovato DMG900, ABB B24 series and Baset Pajouh B851. Voltage, current, active and reactive power, power factor, THD, energy and frequency are recorded. The individual harmonics stay on the plant computer's own screens.

Up to 8 devices on the computerUp to 4 devices on LinkGrid, load, solar, diesel
💾

Local archive that survives outages

Data is stored at the plant and collection carries on independently of the internet. Once reconnected, the backlog is sent and the missing history is rebuilt — including daily energy, which is backfilled on the first connection.

The data-retention policy is configurable and old archives are compacted automatically. Archive tools for the administrator: delete a period, renumber inverters, merge the previous computer's archive and restore — every change makes a backup before it runs, and inverter errors are never deleted.

A full copy of the plant folder — the database, the settings, the updates, the reports and the logs — can be placed on another disk at an interval you set: a second disk inside the case, an external hard disk, or a flash drive. The interval is from one day to one year, and the default is every seven days. The drive the archive already lives on, and another partition of that same disk, are not listed; a copy there is lost with that disk. Nothing is copied until a drive is chosen, and the database is copied from a snapshot while the program is writing it.

Works through internet outagesHistory rebuiltSecond disk or external drive

2. Analysis and diagnosis

Where a number becomes a decision.

🤖

AI engine

Every inverter, every MPPT and every string is compared with its peers in the same plant at the same moment, and with its own behaviour on similar days; the sky is the same for all, so cloud and heat drop out of the comparison. MPPT voltages are read too: a short-circuited bypass diode and gradual voltage loss (PID) do not show in the current, but they do in the voltage.

Each finding comes with the kilowatt-hours lost per day and the specific action for that type of finding; anything whose cost is trivial is not said, a live problem must be seen in three cycles in a row, and the program grades itself on how its findings ended. The inverter's own report always comes first.

The full AI explanation ›

The plant is its own irradiance sensorLoss in kilowatt-hoursSilence instead of a wrong statement
💸

The loss list: what is eating your electricity

From fully measured days: which inverter, since which day, how many kWh per day and how many rials per month it produced less than its neighbours, and the likely cause from the inverter's own errors. Sorted by cost, so you can decide whether it is worth sending someone today.

If the plant computer does not send this list, the server builds the same analysis from its own data.

kWh and rialsPersistent under-production / new dropLikely cause
🧾

Configuration checked against measurement

A wrong configuration quietly and steadily spoils every indicator. The software compares the settings with what the inverter actually reports: nameplate power, plant capacity, number of MPPTs, an input carrying current that is not in the configuration (and the reverse), and the number of panels per string from the voltage.

The "All parameters" table shows every MPPT and string of the model, whatever is recorded in the configuration; so a configuration mistake is visible.

Nameplate and capacityInput wiringPanel count from voltage
📐

Performance ratio and expected energy

PR and specific yield calculated per IEC 61724, actual production compared with expected production, and a breakdown of whether a shortfall came from lower irradiance or from the plant itself.

Rated capacity is taken from the plant's real configuration, not from a default number — the very thing that, if wrong, makes PR and the forecast completely meaningless.

IEC 61724PRSpecific Yield
🧪

DC-side and string analysis

String health assessed on the basis of IEC 62446, taking environmental parameters into account: temperature, soiling and the effect of cleaning, corrosion and site altitude.

IEC 62446MPPTDC string
⚡

Power quality

Individual harmonics and THD/TDD assessed against IEEE 519, grid voltage quality per EN 50160 and event classification based on IEC 61000-4-30. Grid codes (VDE/IEC/IEEE) for checking compliance at the connection point.

IEEE 519EN 50160IEC 61000-4-30
🌤️

Solar working window and weather

The software knows when it is night: no "zero production" alert is raised at an hour when the sun has not risen. Local weather data is also used as context for analysis and display.

Actual local sunrise/sunsetNo false night-time alarms

3. Day-to-day operation

The work the operator and the maintenance manager deal with every day.

🚨

Alarm center

The full ISA 18.2 alarm life cycle: active, acknowledged, shelved, escalated, closed — with EEMUA-191 indicators to measure whether the alarm load is manageable at all.

Audible alarm, real errors kept apart from AI findings, and every inverter brand's error codes decoded into plain, understandable text.

ISA 18.2EEMUA-191Error-code decoding
🔧

Operations and maintenance

Work orders, a preventive-maintenance catalogue with ready templates for plant equipment, spare-part consumption and the history of each piece of equipment.

Every job records who did it — and if user login at program start is turned off, the name is taken from the operator shift table and the time of the job; so work is attributed to a person without forcing a login on the line operator.

With the O&M package, the owner marks each AI finding in the app and web version as "correct / nothing there / fixed", and it is recorded in the plant log.

Work ordersPM with ready templatesOperator shiftsOwner feedback
📊

Energy meter and financial report

Bar chart of daily energy, both the plant total and per inverter, with period selection on the Persian calendar, zoom, average production, revenue in rials and print output.

Per inverterPersian calendarPrint
🗺️

Graphic plant layout (HMI)

A designable HMI screen: you lay out locations, transformers, substations and inverters just as they are arranged on site, and each piece of equipment takes its status colour on that same picture; so the location of a failure is seen at once. Each inverter's MPPT layout and panel and string configuration are also set from here.

The program's built-in guide also covers plant design relations: number of panels and strings, inverter selection, transformer and grid connection, with a complete example.

Designable HMIMPPT layoutDesign guide
📑

Standard reports

Performance and PR guarantee report, energy and financial report, alarm report — with each site's units, currency and time zone, and a PDF output fit to present to the employer or investor.

PDFMulti-sitePresentable

4. Access from anywhere

The same data, for whoever has to decide.

📱

Mobile app and web version

Android with instant notifications, background monitoring and fingerprint login; and a web version that works on the iPhone and any browser without installation. Bilingual, with Persian/Gregorian/Hijri calendars and light and dark themes. PDF and Excel reports from the phone itself, and system-administrator messages inside the same app.

App page ›

AndroidWeb versionInstant notificationsPDF and Excel
👥

A shared plant, each owner their own share

Several small plants side by side can share one converter, one computer and one software licence to cut costs. The administrator ticks each user's own inverters, and each owner sees only their own plant in the app and web version: power, energy and charts, the capacity of their own panels, efficiency, forecast, alarms and their own selling price.

One computer, several ownersCapacity from the panels
🖥️

Plant station portal

A plant's full dashboard in the browser, for the operator of that site — with nothing to install.

Web portals ›

No installationThree languages
🏭

Company monitoring center

Every supported plant on one map and one dashboard, for the team watching over them remotely. Map tools: search, status filter, weather layer, colouring by power or PR, control-room mode and distance measurement with routing. PDF and Excel reports for each plant, in Persian or English.

Multi-plantLive mapControl-room mode
📡

NuraNet Link data logger

For a plant with no computer: up to 32 inverters on RS-485, uplink over Wi-Fi or a 4G SIM, data kept through internet outages, AI on the board itself, power meters and power analyzers, and set-up with the installer app over Bluetooth. To the server and the owner's app it is exactly like a plant computer.

NuraNet Link ›

4G SIMNo computerRemote configuration
🛟

NuraNet Link R

A separate product, for a plant that has a computer. Link R is not the primary reader: the computer reads the line and Link R listens. If the line sees no byte for a set time — ten minutes by default — it reads the inverters itself and sends them to the server, and it gives the line back when the computer returns.

NuraNet Link R ›

Line backupOne line, one readerBeside the computer

5. Keeping the system in service

Things you don't see as long as they work.

🔐

Access control and device authentication

Each user account is tied to one channel (app, web version, station portal) and one device; a new device must be approved by the administrator, and until then the previous device keeps working.

Security and licensing ›

One account, one deviceAdministrator approval
⬆️

Signed updates

A new version is released in stages and with a digital signature; an unsigned package is not installed, and updates happen without a site visit.

Digital signatureStaged rollout
🛠️

Remote plant configuration

Part of the plant configuration can be changed remotely from the admin panel; the change is validated with an HMAC signature, and if the result is not healthy it automatically reverts to the previous setting.

HMACAutomatic rollback
📡

Connection status box

The software's main screen shows the link to the server explicitly: green means data is arriving, orange means the connection is down, grey means the plant has not yet been registered with the server. The "down" threshold is derived from the plant's own sending period.

Every internet outage is recorded in the system log with where it broke: the local network, DNS, the internet or the server itself — so when data is not arriving, it is clear where the fault lies.

Three clear statesAdaptive thresholdWhere it broke
🎨

A common colour standard

Seven states, seven fixed colours and one order of priority — the same in the Windows software, the app, the web version, the station portal and the monitoring center. Colour is not taken from the program theme, so its meaning does not change between themes; and each inverter's colour always agrees with the plant's colour.

7 states5 productsFixed meaning
🌍

Three languages, without flipping the screen

The Windows software in Persian, English and Arabic; choosing Persian only translates the words and does not mirror the layout of menus and tables, so an operator used to one layout is not confused.

فارسی / English / العربية
Read on

More about NuraNet

Want to see how it works on your own plant?

We will set up a demo session and check the compatibility of your inverters — free of charge.

The same number answers on WhatsApp, Telegram, Eitaa and Bale.