Iran's four-period electricity tariff and demand management: a guide to cutting the factory's bill
Two factories with the same energy consumption can get bills 30 to 40 percent apart. The difference lies in the time of use and the peak load — exactly the two things Iran's electricity tariff prices on.
The four tariff periods (TOU)
In Iran's industrial electricity tariff, the day and night are divided into periods with different rates:
| Period | Approximate relative rate | Notes |
|---|---|---|
| Off-peak | Half the base rate | Usually the hours from midnight to early morning — the cheapest electricity |
| Mid-load | Base rate | Most hours of the day |
| Peak | Several times the base rate | The grid's peak hours (varying by season) — the most expensive electricity |
| Friday peak | Special rate | Peak hours on Fridays, at a separate rate |
The exact hours of each period are announced by the distribution company and shift between seasons; this seasonal shift is one of the common causes of factories' planning errors.
Demand: a cost recorded through fifteen minutes of carelessness
Apart from energy, an industrial customer also pays for capacity (demand). The meter measures average power in 15-minute windows, and the month's maximum is the basis of the charge. So if, just once in a month, all the furnaces and compressors switch on together and a new 15-minute peak is recorded, its effect stays on the bill — and if you exceed the contracted capacity, the cost is heavier still.
Five practical ways to cut the bill
- Shift load to off-peak: move energy-hungry but time-flexible processes (charging, pumping, some furnaces) to the night shift. The several-fold rate difference makes this the most profitable step.
- Peak shaving: stagger the start-up of large equipment and avoid heavy loads coinciding in one 15-minute window.
- Live demand warning: have a system that says, in the middle of the 15-minute window, "at this rate a new peak will be recorded" — while there is still time to switch off a sheddable load.
- Eliminate the reactive penalty: a power factor below 0.9 is penalised (the reactive-penalty article).
- Review the contracted capacity: if actual demand is always far below the contract, amending the contract lowers the fixed cost; if you exceed it regularly, you pay a penalty.
Why should the calculation be independent of the utility's meter?
To manage the bill, you have to know it "before it is issued". Energy-management software reading the factory's own analyzers calculates each period's energy and the demand moment by moment. An important technical point: analyzers' internal clocks are unreliable and run fast or slow; a correct TOU calculation must be based on the server's exact clock, otherwise peak consumption gets recorded as mid-load and the bill forecast turns out wrong.
TavanaNet calculates the consumption in each tariff period and the demand using the server's exact clock, and shows the month's bill forecast.
Meet TavanaNet